ARIES Program
Public Information Site
 
 
 
 

ARIES Documents -- Meetings Archive

ARIES Project Meeting, February 24-25, 2005

Building7, Room 120
General Atomics, La Jolla, CA

Minutes (pdf,    Word,    html)


Thursday 24 February 2005

 
8:00 Coffee GA Hosts
 

Administrative

8:30 Welcome to General Atomics and Logistical Info A. Turnbull
8:35 Review of Meeting Agenda L. Waganer
8:40 Status of ARIES CS Study F. Najmabadi
 

Compact Stellarator Reactor Integrated Systems Assessment

9:00 Results of Systems Code Studies J. Lyon
9:45 Break
 

Compact Stellarator Power Plant Physics Basis

10:00 Attractive 2-FP and 3-FP Plasma and Coil Configurations - - Recent Configuration Development Results    (pdf, Power Point)    L-P Ku
11:00 Field Tracing, Alpha Loss Prediction, and Divertor Requirements (pdf)    T.K. Mau
11:30 Update on Parallel Code Development for Divertor Design Requirements (pdf, Power Point)    H. McGuinness
11:45 General Discussion on Divertor Physics Issues
12:00 Lunch
 
1:00 Modeling of Particle and Power Control for Compact Stellarators (pdf, Power Point)    A. Grossman
1:30 Beta Limits for Compact Stellarators - Are They Real? (pdf)    A. Turnbull
 

Compact Stellarator Power Plant Engineering Assessment

2:00 Power Core Assessment and Evaluation - Next Steps (pdf, Power Point) R. Raffray
2:20 Comparison of 2-FP and 3-FP CS Geometry Configurations (pdf, Power Point) X. Wang
2:40 Dual-Cooled Blanket Modular Replacement Design Approach (pdf, Power Point) X. Wang
3:10 Changes to LiPb/FS/He System and Implications for Radial Build (pdf) L. El-Guebaly
3:40 Break
 
3:55 EU-Helium-Cooled Divertor Design Study Results (pdf, Power Point) T. Ihle
4:25 ARIES-CS Divertor Design & Analysis: Engineering Plan of Action (pdf, Power Point) T. Ihle
4:45 CS Coil Design Definition/Fabrication Definition    L. Bromberg
 
5:15 Adjourn
 

 

Friday 25 February 2005

 
8:00 Coffee GA Hosts
 

Compact Stellarator Safety Analysis

8:30 Pressurization Accidents in ARIES-CS (pdf, PowerPoint) B. Merrill
9:00 LOCA/LOFA Analyses for Blanket and Shield Only Regions - LiPb/FS System (pdf, Power Point) C. Martin
9:30 General Discussion on Safety and Engineering Issues
10:00 Break
 
10:15 Discussion, Action Items, and Plans F. Najmabadi
 
11:00 Adjourn

Top of the page.