ARIES Program
Public Information Site
 
 
 
 

ARIES Documents -- Meetings Archive

ARIES Project Meeting, 27-28 April 2006

Research Presentations, Room 1025
University of Wisconsin, Madison


Thursday 27 April 2006

 
8:00 Coffee UW Hosts
 

Administrative/General

8:30 Welcome to UW J. Kulcinski
8:40 Logistical Information L. El-Guebaly
8:45 Review of Meeting Agenda L. Waganer
8:50 Status of ARIES-CS study and Purpose of Meeting F. Najmabadi
 

Compact Stellarator Power Plant Integrated System Assessment

9:00 Assessment of Power Core Parameters and Related Costs (pdf ) L. El-Guebaly
9:20 Systems Code Results: Impact of Physics and Engineering Assumptions (pdf ) J. Lyon
10:35 General Discussion of Systems Code Results All
10:45 Break
 

Compact Stellarator Power Plant Physics Basis

11:00 New Development in Plasma and Coil Configurations (pdf, PowerPoint) L-P Ku
12:00 Lunch
1:00 Update on Beta Limits for Compact Stellarators (pdf , PowerPoint )    A. Turnbull
1:30 Divertor Heat Load Analysis and Derived Geometry (pdf )    T. K. Mau
2:00 General Discussion of Physics Basis All
2:20 Break
 

Compact Stellarator Power Plant Engineering Assessment

2:30 Near-Final Radial Build and Nuclear Parameters (pdf ) L. El-Guebaly
3:00 Status of CAD/MCNP 3-D Analysis (pdf , Power Point ) P. Wilson
3:15 Reactor Building Concept Assessment (pdf , Power Point ) L. Waganer
3:30 Experimental Verification of Gas-Cooled T-Tube Divertor Performance (pdf , Power Point ) S.Abdel-Khalik
4:00 Design Definition of Stellarator Coil Systems (pdf ) L. Bromberg
4:30 Design Definition and Magnetic-Structural Analysis of Coil Structure (pdf ) X. Wang
5:00 Updates of the ARIES-CS Power Core Configuration and Maintenance (pdf ) X. Wang
 
5:30 Adjourn
 

 

Friday 28 April 2006

 
8:00 Coffee UW Hosts
 

Compact Stellarator Power Plant Engineering Assessment (cont'd)

8:30 Design Definition of Divertor Support (pdf , Power Point ) R. Raffray
 

Compact Stellarator Radwaste Management and Safety Analyses

9:00 Recommended Change to ARIES Top-Level Radwaste Requirement (pdf ) L. El-Guebaly
9:20 Safety Studies for Port-Based Maintenance (pdf , Power Point ) B. Merrill
9:50 Status of Finalizing Power Core Engineering Baseline (pdf , Power Point ) R. Raffray
10:20 Break
 
10:30 Discussion, Action Items, and Plans F. Najmabadi
 
11:00 Adjourn

Top of the page.