ARIES Program
Public Information Site
 
 
 
 

ARIES-CS CAD DRAWINGS

Click on the figures to view and down-load high-resolution figures for printing or including in documents.

Plasma and coils (R=7.75 m):


Plasma
(One period)

Coils
(One period)

Coils and plasma
(One period)

Coils
(Top view)

Plasma and coils
(Top view)

Plasma and coils
(Front view)

Plasma and coils
(Side view)

Coil structure (R=7.75 m):


Coil tube
(One period)

Coil tube
(With grooves)

Coil tube
(With Windings)

Coil tube
(Top view)

Coil tube
(Side view)

Coils&coil tube
(With cover plates)

Coils&coil tube
(Bottom view)

Coils&coil tube
(Top view)

Coil tube
(Cross-section)

Power Core (R=7.75 m):


Power core
(Bird view)

Power core
(No lables)

Power core
(Bird view)

Coil structure
(Bird view)

Coil structure
(No lables)

Coil structure
(Top view)

Power core
(Elevation view)

Power core
(No lables)

Power core
(Elevation view)

Power core
(Elevation view)

Power core
(Plane view)

Power core
(No lables)

FW/Blanket/Shiedl
(0 degree)

Divertor integration
(10 deg)

Divertor Attachment
(Cross-section)

Vacuum pumping
(20 degree)

ECH/Aux. port
(35 degree)

FW/Blanket/Shield
(40 degree)

FW/Blanket/Shield
(50 deg)

FW/Blanket/Shield
(60 degree)

Mechanical Attachment for Modular Maintenance (R=7.75 m):


Blanket modules
(Isometric view)

Blanket modules
(Front view)

Blanket modules
Transprance view

Blanket modules
Explode view

Blanket modules
Cutting steps

Cutting steps
(1)

Cutting steps
(2)

Cutting steps
(2)

Cutting steps
(3)

Cutting steps
(4)

Attachment
(1)

Attachment
(2)

Attachment
(Back view)

Attchment
(3)

Attchment
(4)

Manifold

Diverter
(Attachment 1)

Diverter
(Attachment 2)

Dual-Cooled Blanket Modular Design:


Isometric view

Exploded view

Pb-Li flow scheme
(1)

Pb-Li flow scheme
(2)

Pb-Li flow scheme
(3)

He flow scheme
(1)

He flow scheme
(2)

He flow scheme
(3)

He flow scheme
(4)

He flow scheme
(5)

He flow scheme
(6)

He flow scheme
(7)

Back plate

Grid plate

Separation plate

Top plate

Tor. manifolds

Modular maintenance approach (R=8.25 m):


Power core
(Plan view)

Power core
(Plan view)

Power core
(Elevation view)

Power core
(Elevation view)

Power core
(Bird view)

Power core
(Top view)

VV
(Bird view)

VV
(Front view)

Coil tube
(Top view)

VV
(0~60 degree)

VV
(60~120 degree)

Assembly sequence
(1)

Assembly sequence
(2)

Assembly sequence
(3)

Assembly sequence
(4)

Assembly sequence
(5)

Major ports
(Above)

Major ports
(Below)

Mechanical Attachment for Modular Maintenance (Optional Design):


Blanket modules
(Isometric view)

Blanket modules
(Enlarged view)

Blanket modules
Transprance view

Blanket modules
Explode view

Blanket modules
Cutting steps

Cutting steps
(1)

Cutting steps
(2)

Cutting steps
(2)

Cutting steps
(3)

Cutting steps
(4)

Field-period maintenance(R=8.25 m):


One field-period
(Top view)


One field-period
(Side view)

Three field-periods
(Top view)

Support tube
(One period)

Support tube
(With grooves)

Support tube
(With coils)

Support tube
(Top view)

Support tube
(Different view angle)

Support tube
(Inside view)

Support tube
(Showing the cuts)

Support tube
(Inside view)

Support tube
(Side view)

Support tube
(Full period)

Motion analysis
(1)

Motion analysis
(2)

Motion analysis
(3)

Cross section
(At 0 degree)

Cross section
(At 60 degree)

Cross section
(At 0 degree)


Cross section
(At 0 degree)

Plan view

Plan view

Elevation view

Uniform thickness
(1.2 m)

No clearance

Interferance
(1.57 m)

Interferance
(2.52 m)



FW boundaries
(Before shiftting)

FW boundaries
(After shiftting)

FW/blanket/shields
(0 degree)

FW/blanket/shields
(30 deg)

FW/blanket/shields
(60 deg)

FW/blanket/shields
(60 degree)

FW/blanket/shields
(50 deg)

FW/blanket/shields
(40 deg)

FW/blanket/shields
(40 deg)

FW/blanket/shields
(30 degree)

FW/blanket/shields
(30 deg)

FW/blanket/shields
(20 deg)

FW/blanket/shields
(10 deg)

FW/blanket/shields
(00 deg)

Modular design with Flibe/Steel blanket:


Isometric view

Front view

A-A and B-B view

C-C view

Top view

First wall

Removing FW disk

Removing blanket

Modular design with Pb-17Li/SiC/SiC blanket:


Plan view
(One segment)

Attachment

Coolant flow path

Modular design with ceramic breeder blanket:


Plan view

Flow scheme

Cooling plate

FW welds

Manifold

Blanket module

Blanket module
(with ceramic beds)

Blanket box

Access tube

Access tube

Access tube

Access tube

Flow scheme
(in BZ)

Breeding unit

Breeding unit

Blanket configuration suitable for sector maintenance:


1/2 unit

AA section

Two field period plasma and coils(16 coils):


Half period

Half period

One period

Full period

Plasma & Coils
(Top view)

Plasma & Coils
(Left side view)

Plasma & Coils
(Right side view)

Port Layout
(Top view)

Port Layout
(Bird view)

Port Layout
(Bird view)

Port Layout
(Bird view)

Port Layout
(Left side view)

Port Layout
(Right side view)

Two field period plasma and coils(12 coils):


Half period
(Front view)

One period
(Front view)

Two period
(Top view)

Coils
(Front view)

Coils
(Top view)

Plasma & coils
(Front view)

Plasma & coils
(Side view)

Plasma & coils
(Side view)

Plasma & coils
(Top view)

Two field period plasma and coils(8 coils):


Top view

Front view

Side view

Coils
(Top view)